Civil Work Construction of Factory Sheds


Client Name: Ahmattem Industrial Engineering PLC
Percentage of Works Completed: 100%
Project cost in BIRR: 8,176,976.70 Birr
CONTRACT TYPE: PRIME CONTRACTOR
Scope of project: Earthworks, reinforced concrete foundations, retaining walls, steel frame installation, corrugated cladding, roofing, drainage, internal roads, and utility provisions.
We delivered new factory sheds from the ground up. Our team prepared the site, built strong concrete bases, and installed retaining walls for stability. We then erected the steel frames, added corrugated wall cladding and roofing, and set up drainage to protect the site from rain. The project also included internal roads for easy movement and basic utility lines for water and power.


We installed a strong steel frame and new roof panels that allow the passage of bright skylights. The floor area was cleared and graded, ready for fresh concrete and service lines.


The facilities were finished on time and handed over ready for use.